- 367 ROOMS
- 28 STORIES
- SERVICE ELEVATOR: MODERNIZED
- $3M CAPITAL PROGRAM
Properties
Floor 2
Front Desk
About: who I am and what I am looking for.
- $3M capital work overseen at PUBLIC
- $1.5M operating budget at PUBLIC
- 19 union staff led on one team
- 800 rooms in the largest hotel I have run
About
I am a hotel engineering director in New York. Over 15 years I have run engineering at 7 properties: PUBLIC Hotel New York, Ace Hotel Brooklyn, The Dominick, Park Lane New York, the Crowne Plaza Times Square, The St. Regis New York and The Westin New York Grand Central, from 286 to 800 rooms.
The job is the building. I own fire and life safety, HVAC and building management systems, elevators, the capital plan, the operating budget, the union engineering team and the reporting to ownership and executive leadership. At PUBLIC that meant about $3 million in capital work, a $1.5 million operating budget, a $470,000 service elevator modernization and the engineering recovery after major water damage.
I left PUBLIC in October 2026. I am looking for my next role as a Director of Engineering or above with a luxury or full-service operator or owner in New York, and I am available now.
Floor 3
Guest Floors
Experience: where I have worked, most recent first.
-
to Lower East Side, New York
PUBLIC Hotel New York
PUBLIC, an Ian Schrager Hotel
Director of Engineering & Security
- Directed engineering and security for a 367-room luxury lifestyle hotel: building infrastructure, preventive maintenance, emergency preparedness and regulatory compliance.
- Oversaw about $3 million in capital improvement work and a $1.5 million departmental operating budget, and advised ownership and executives on project priorities, procurement and risk.
- Coordinated a $470,000 service elevator modernization, and the maintenance, inspections and contractor performance for the hotel's elevators and escalators.
- Led the engineering recovery after major water damage, working with specialized vendors and insurance representatives to restore the affected building systems. Oversaw fire alarm recovery, HVAC and BMS repairs, and the compliance work supporting FDNY, DOB and temporary certificate of occupancy requirements.
- Supported lobby, restaurant, guest room, flooring and lighting renovations, and took part in the PUBLIC West Hollywood construction project through engineering and construction coordination.
- Rooms
- 367
- Notes
- Opened 2017, Herzog & de Meuron, 28 stories, 215 Chrystie Street.
-
to Downtown Brooklyn, New York
Ace Hotel Brooklyn
Ace Hotel
Director of Engineering & Security
- Led facilities operations for a 14-story, 286-room hotel and supervised 8 union employees, including scheduling, payroll and performance.
- Oversaw $750,000 in capital expenditures across Engineering, Security and IT, and directed a commercial kitchen renovation and a ballroom flooring replacement.
- Set up preventive maintenance practices, wrote 8 Security SOPs and introduced inventory controls for the department.
- Rooms
- 286
- Notes
- Opened August 2021, 14 stories, 252 Schermerhorn Street
-
to SoHo, New York
The Dominick Hotel
The Dominick
Chief Engineer
- Led engineering for a 46-story, 396-room hotel with a 12-person union team, and managed capital improvements and vendor execution.
- Coordinated an RFID lock modernization across all 396 rooms, spa improvements, guest room refurbishments and the preventive maintenance program.
- Rooms
- 396
- Notes
- 46-story tower at 246 Spring Street
-
Within Sep 2015 to Oct 2022Central Park South, New York
Park Lane New York
Highgate
Chief Engineer
- Led engineering for a 610-room hotel and managed 19 union employees: staffing, payroll, labor relations and development.
- Helped complete the final 40% of a property-wide renovation across the guest rooms, lobby and rooftop bar, coordinating contractors and inspections.
- Managed the department budget, P&L reviews, purchasing and procurement. Named Manager of the Quarter for Q1 2021.
- Rooms
- 610
- Notes
- 36 Central Park South; property-wide renovation by Yabu Pushelberg, reopened 2021
-
Within Sep 2015 to Oct 2022Times Square, New York
Crowne Plaza Times Square Manhattan
Highgate
Assistant Director of Engineering
- Managed facilities operations for an 860,000 square foot, 795-room hotel with 25,000 square feet of event space and 28 meeting rooms.
- Coordinated 800 headboards, 500 bathtub reglazings, 800 countertops and a lighting retrofit across all 795 guest rooms.
- Managed a 25,000 square foot event-space flooring renovation and improvements to the lobby and guest rooms.
- Rooms
- 795
- Notes
- 1605 Broadway; 860,000 square feet; closed 2020, reopened 2022, now the Hyatt Regency Times Square
-
Within Jul 2011 to Sep 2015Midtown, New York
The St. Regis New York
Marriott International
Engineering Manager
- Led retrofit and renovation work at a five-star, 300-room hotel: back of house, restaurant, bar, kitchen and guest bathrooms.
- Coordinated contractors, schedules, procurement, budgets and engineering inventory for the renovation work.
- Rooms
- 300
- Notes
- Five-star, 2 East 55th Street.
-
Within Jul 2011 to Sep 2015Midtown East, New York
The Westin New York Grand Central
Marriott International
Engineering Manager (promoted from Coordinator)
- Promoted from Engineering Coordinator to Engineering Manager within the first year.
- Co-led capital improvements for a 785,000 square foot, 800-room hotel, including 1,600 windows and the guest room entry systems.
- Supported guest room refurbishment projects and delivered employee safety training aligned with New York City requirements.
- Rooms
- 800
- Notes
- 785,000 square feet, 800 rooms
Floor 4
Back of House
Skills: systems, compliance and the team.
4.1 Systems
- HVAC: chillers, boilers, cooling towers and air handling
- Building management systems (BMS) and controls
- Elevators and escalators: maintenance, inspections and modernization
- Fire alarm, sprinkler and standpipe systems
- Electrical distribution and emergency power
- Plumbing, domestic hot water and water treatment
- Commercial kitchen, laundry and refrigeration equipment
- Guest room locks (RFID), CCTV and access control
- Work order and preventive maintenance systems (HotSOS, Transcendent, ALICE, Knowcross)
- Water damage and building system restoration
Platforms
- HotSOS
- Synergy
- ADP
- Transcendent
- Opera
- Microsoft Office
- Concur
- Paycom
- ALICE
- UKG
- Knowcross
4.2 NYC compliance
| Law | What |
|---|---|
| FDNY Certificates of Fitness | The Fire Department licenses the people who operate sprinkler, standpipe and fire safety systems. A hotel keeps enough certified staff on every shift to stay legal and safe. |
| DOB elevator CAT1 and CAT5 | Every elevator gets an annual Category 1 test and a 5-year Category 5 full-load test, filed with the Department of Buildings inside tight windows. |
| Local Law 11 (FISP) facade | Buildings over 6 stories have the facade inspected every 5 years. Engineering coordinates the inspection, any sidewalk shed and the repairs. |
| Local Law 87 energy audit | Every 10 years the building gets an energy audit and retro-commissioning, which is where the next round of efficiency projects comes from. |
| Local Law 97 carbon caps | Hotels over 25,000 square feet face emissions limits from 2024, tighter from 2030. It shapes the chiller, boiler and controls capital plan. |
| Local Law 77 cooling towers | Cooling towers are registered with the Health Department, sampled for Legionella quarterly and certified annually. The engineering director is usually the responsible person. |
| Local Law 152 gas piping | A licensed master plumber inspects exposed gas piping on a 4-year cycle. A failure means a shut gas line and a dark kitchen. |
| DOB boiler inspections | Each boiler is inspected annually and the report filed within 14 days. Late filings carry fees per boiler. |
| DEP backflow prevention | Backflow devices are tested every year and the results filed within 30 days to protect the city water supply. |
| NFPA 25 and 72 fire system testing | Fire alarm, sprinkler and standpipe systems are inspected and tested monthly, quarterly and annually, with a fire watch and FDNY notification whenever a system is impaired. |
4.3 Leadership and finance
- Local 6 union teams of 8 to 19: scheduling, payroll, labor relations
- Capital planning and P&L
- Owner and executive reporting
- Vendor and contractor management
- Renovation and construction coordination
- Emergency response and recovery
- Security operations and SOPs
- Training and development
4.4 Education
- Apex Technical SchoolHeating, Ventilation, Air Conditioning and Refrigeration Maintenance2016
- Massanutten Military SchoolHigh School2004 to 2006
Languages English; Spanish
Awards
- Manager of the Quarter, Q1 2021 (Park Lane New York)
Floor 5
Project Corridor
Projects: capital work. Open a door for the detail.
Door 01
Service elevator modernization
The service elevator carries housekeeping, engineering, food and beverage and every delivery in the building. I coordinated the $470,000 modernization with the elevator contractor, along with the ongoing maintenance, inspections and contractor performance reviews for the hotel's elevators and escalators, while the hotel stayed open.
- Elevators
- DOB
- $470K
- PUBLIC New York
Door 02
Water damage recovery and fire alarm restoration
After major water damage at PUBLIC I led the engineering recovery: the specialized restoration vendors, the insurance representatives and the repair of the affected building systems. That included fire alarm recovery, HVAC and BMS repairs, and the compliance work with FDNY and DOB that supported the temporary certificate of occupancy.
- Water damage
- Fire alarm
- FDNY and DOB
- Insurance
Door 03
Park Lane renovation, final 40%
Park Lane New York was partway through a property-wide renovation when I was Chief Engineer. I helped complete the final 40% of it across the guest rooms, the lobby and the rooftop bar, coordinating the contractors and inspections while running the day-to-day engineering of a 610-room hotel with a team of 19 union employees.
- Renovation
- 610 rooms
- Park Lane New York
- Highgate
Door 04
Crowne Plaza guest room program
At the Crowne Plaza Times Square, an 860,000 square foot hotel with 795 rooms, I coordinated a guest room program of 800 headboards, 500 bathtub reglazings, 800 countertops and a lighting retrofit across all 795 rooms. I also managed the flooring renovation of the 25,000 square feet of event space and improvements to the lobby and guest rooms, with the hotel in operation.
- Guest rooms
- 795 rooms
- Event space
- Crowne Plaza Times Square
Door 05
Dominick RFID locks and spa
At The Dominick, a 46-story hotel in SoHo, I coordinated the modernization of the guest room locks to RFID across all 396 rooms, along with improvements to the spa and guest room refurbishments. The work was done with a 12-person union team and the vendors I managed, alongside the preventive maintenance program.
- RFID locks
- 396 rooms
- Spa
- The Dominick
Door 06
Ace Brooklyn capital program
At Ace Hotel Brooklyn I oversaw $750,000 in capital expenditures across Engineering, Security and IT. The main projects were a commercial kitchen renovation and a ballroom flooring replacement. On the operations side I set up preventive maintenance practices, wrote 8 Security SOPs and introduced inventory controls for the department.
- $750K capex
- Commercial kitchen
- Security SOPs
- Ace Hotel Brooklyn
Floor 6
Contact
Contact: how to reach me.
- [email protected]
- Phone number available in the vCard or by email
- Save contact (.vcf)
Send this page to someone who should see it.
Add me to your ATS
Most hiring platforms only let you invite a candidate from inside your own account. Everything you need to add me as a sourced candidate is below.
Name: Miguel Pagan Title: Director of Engineering Email: [email protected] Phone: available in the vCard LinkedIn: https://www.linkedin.com/in/miguel-pagan-9a3655a0/ Résumé (PDF): https://miguel-pagan.com/assets/Miguel-Pagan-Resume.pdf Site: https://miguel-pagan.com